Eagle Mountain - Woodfibre Gas Pipeline
Providing Project Management services for the geotechnical & hydrotechnical engineering scopes for the Eagle Mountain - Woodfibre Gas Pipeline. It involves adding new pipe (40km x NPS 24), beginning north of the Coquitlam watershed and ending at the Woodfibre LNG site.
FortisBC is proposing an expansion of a portion of their existing natural gas pipeline system that serves Squamish, the Sunshine Coast and Vancouver Island, British Columbia.
2023 to Current
Net Zero Pipeline Project
Provided Project Management services on Spread 1 (~17km x NPS 8 & 12) within the congested Heartland region and inside the petro-chemical plant. The Net-zero Pipeline Project is a Carbon Capture and Storage (CCS) pipeline in central Alberta from the Fort Saskatchewan to the Red Deer, AB region.
2022 to 2023
Onion Lake Lateral Project
Provided Project Management services on the the 32 kms of 4-inch condensate and 8-inch blended crude pipelines that will be connected to thermal production facilities north of Lloydminster, AB/SK. https://huskymidstream.com/growth/projects/onion-lake-lateral.asp
2021-2022
Alberta Carbon Trunk Line
Provided Project Management services on Spreads 1, 2A and 3 (NPS 16). The ACTL is a project that spanned 247 kms in Alberta that collects carbon dioxide to transport to oil reservoirs near Clive AB for enhanced oil recovery.
2018-2019
Trans Mountain Expansion Project
Provided Construction Engineering Management to mostly the northern Pipeline Spreads in Alberta and British Columbia. Also provided Project and Construction Management services in various capacities on Spread 3 (NPS 42) & 4 (NPS 36).
The overall Trans Mountain Expansion Project spans 1,150 kms while twinning the existing pipeline between Strathcona County, AB and Burnaby, BC.
2020 to 2022
Moose Jaw Supply Project
Provided Project Management services on the Moose Jaw Supply NPS 16 pipeline construction project. The pipeline construction included approximately 30.6 kilometer (NPS 16) steel transmission pipeline between Belle Plaine Compressor Station and the SaskPower Station which traversed primarily through cultivated agricultural lands.
2022
Peace Pipeline Expansion
Provided Construction Management services on Spreads 4, 5, 8 and 10 (NPS 20), of the Pembina Pipeline Expansion - Phase VII. The total expansion project includes 20-inch, approximately 220 km pipeline in the La Glace-Valleyview-Fox Creek corridor in the northwestern AB.
Also provided construction engineering pre-planning services on the Phase VIII which includes a new 10-inch and 16-inch pipelines in the Gordondale to La Glace corridor for segregated pipeline services from the Montney area.
2019-2020